Demelza House Hospice approached JPS regarding solar panel installation. JPS worked with Demelza House to design a scheme to minimise their electrical expenditure. 

Following a consultation with UK power, the system would require export limitation. Once the designs were approved JPS worked with all stake holders including care staff to ensure smooth installation without effect on day to day business.

During installation JPS engineers adjusted the programme and installation areas to meet the operation requirements of Demelza House.  The final installed capacity under phase 1, was 100KW, 293 x JA 340W Panels.

The installation of 293 panels took 6 weeks to complete.

Demelza House Hospice approached JPS regarding solar panel installation. JPS worked with Demelza House to design a scheme to minimise their electrical expenditure. 

Following a consultation with UK power, the system would require export limitation. Once the designs were approved JPS worked with all stake holders including care staff to ensure smooth installation without effect on day to day business.

During installation JPS engineers adjusted the programme and installation areas to meet the operation requirements of Demelza House.  The final installed capacity under phase 1, was 100KW, 293 x JA 340W Panels.

The installation of 293 panels took 6 weeks to complete.